For MEP and engineering companies

An app for MEP and engineering companies

Current documentation always at hand, tasks for your subcontractors, progress reports for the general contractor and full documentation of completed installations – including concealed ones. In one app, offline too.

Trusted byAC GroupHybryd16DEFORRexer Engineering
Stryków HallGround floor · work progress

Hall A · grid A–C/1–3 – sprinkler system

Contractor Own crew

Plan 11.04 → 18.04

Status Completed · 8 photos

Installation photos added8 photos · hall A · grid B-2
Progress report for the GCPDF · ready in a few minutes

66projects of one MEP company in Hustro*

30 sinstallation photo pinned to the drawing

5 minprogress report for the GC

Offlinein basements, shafts and switch rooms

* customer data – Hybryd16 Group

Challenges

You deliver installations for general contractors. Do these problems sound familiar?

Each one costs your team hours, and the company disputed invoices and rework. Hustro sorts them out without changing how you work on site.

Documentation

“The crew installed from an old revision”

Drawings circulate by email and sit on drives. The error comes out at handover – removal, new materials and lower margin.

The current drawing revision for everyone on site – offline too.

Subcontractors

“The subcontractor’s task got lost in phone calls”

Arrangements by phone and text, with no due date and no trace. Later nobody remembers who was supposed to do it.

A task with a location on the drawing, due date and reminders – the subcontractor doesn’t need to install the app.

Reporting

“The GC asks about work progress every week”

You gather information from crews, photos and spreadsheets, and the report is out of date the moment it is sent.

A progress report with tasks and photos in a few minutes.

Concealed installations

“The ceiling is closed – and there’s no proof of what’s above it”

Once enclosed, you can no longer show how the installation was done. Every doubt from the GC means a risk of opening things up.

Photos before enclosure pinned to the drawing – with date and author.

Billing

“The GC disputes the scope of work done”

Without full documentation it’s hard to prove what was done and when – and that delays payments.

A full work history with photos and dates – ready in seconds.

Handovers

“Tests and handovers on paper reports”

Reports retyped by hand, photos kept separately, and non-conformities written in a notebook.

Checklists on your phone and a PDF report generated automatically.

How it works

Four things an engineering company does in Hustro

From the current drawing to a report for the general contractor. Click a stage to see it in the app.

Documentation · Stryków Hall
PDF
E-05 Electrical installations – hall BRev. C · added 10 min ago
Current
PDF
W-03 Ventilation – dock zoneRev. E · 14.09
PDF
S-02 Plumbing – risersRev. B · 03.09
PDF
Material data sheet – cable traysapproved · 29.08
PDF
Pressure test report – riser S-1signed · 21.08
New revision of drawing E-05crews see the change instantly
New taskHall B

LocationHall B · grid D-2 · dwg. E-05

TaskAdjust cable routes per rev. C

SubcontractorElektro-Bud Sp. z o.o.

Due date2 working days

Save and notify

Task sentElektro-Bud · due in 2 days
Reminder before due dateautomatic, no phone calls
Before close-up · offices, ceiling

Ready for close-up3 of 4 items

Cable routes and trays4 photos · dwg. E-05
Documented
Insulated ventilation ducts3 photos · dwg. W-03
Documented
Pressure test – riser S-2PDF report
Compliant
Fire-stop penetrationsphoto pending
In progress
Documentation for the GCphotos with location and date
Work progress · Stryków Hall

0overdue

0in progress

0completed

Plumbing, drainage and process water – risers P1–P6Hall A · Instal-Tech
Completed
Heating – hall B air heatersHall B · in-house crew
In progress
Ventilation and air conditioning – dock zoneDock zone · Vent-Pro
Overdue
Sprinkler system – hall AHall A · Ppoż-Serwis
Completed
Electrical and low-voltage – hall BHall B · Elektro-Bud
In progress
BMS – AHU and switchboard integrationWhole hall · in-house crew
In progress
PDF work progress reportready to send to the GC

Time calculator

How much time does your company lose on reports for the GC?

Set the number of sites and reports to see how many hours your company saves on progress reports and inspection reports.

Time to prepare one report

Manually: notes, photos, Excel, email
In Hustro: site data + PDF report

Indicative estimate: approx. 5 min per item and 40 min to compile a report manually, vs. approx. 30 s per item and 2 min per report in Hustro.

You save per monthYour company saves per month

0 h

With 0 reports a month, that is approx. 0 working days you can spend on the site instead of paperwork.

With 0 reports a month, that is approx. 0 h for each person preparing them – in total approx. 0 FTE less office work.

Comparison

What does work look like before and after Hustro?

Work progressStryków Hall
WK
Plumbing, heating, process water24 of 30 tasks completed
HV
Ventilation and air conditioning1 task overdue
EL
Electrical, low-voltage, BMSin progress · 55%

Report for the GC

One placedrawings, tasks and photos

Current drawings for everyone

One version of the documentation synced in the cloud – online and offline.

Tasks for subcontractors

Every work order has a location, owner and due date, and the system sends a reminder before it expires.

Concealed installations documented

Photos taken before close-up, pinned to the drawing – proof of work for years.

Report for the GC in minutes

The data is already in the system, so the work progress report is always up to date.

Complete work history

Dates, photos and agreements in one place – a strong argument when settling accounts.

On site

The crew and the office work on the same data

A photo of an installation taken before close-up is visible in the office right away. Drawings, subcontractor tasks and reports are always up to date on all devices – no manual file sharing.

Work progress report senttoday, 15:10 · to the general contractor

Testimonials

See what MEP and engineering companies say

Installation contractors who organized their documentation, subcontractor tasks and reporting in Hustro.

AC Group

All installation work in one system

Documenting installation work (especially concealed work), equipment installation, and managing subcontractor tasks and handovers in one system increased the transparency of the investment process.
Karol BrytekImplementation Director / Board Member – AC Group
Read the story
Hybryd16

66 projects in one system

We use Hustro to log defects and prepare reports for general contractors and investors. Subcontractors can contact us about issues without installing the app.
Maciej GmyrekCEO – Grupa Hybryd16
Read the story
DEFOR

We eliminate non-conformities faster

The app enabled more effective quality management and progress monitoring on the construction site. We were able to identify and eliminate potential non-conformities faster.
Mariusz JaskotDeputy Construction Director / Service Manager – DEFOR S.A.
Read the story

More testimonials

Features

Complete support for MEP and engineering companies

Everything you need, from project start to warranty service.

Document workflow

Drawings, revisions and material data sheets with version control.

Tasks for subcontractors

Location on the drawing, due dates, reminders and history.

Concealed installation documentation

Photos taken before close-up, pinned to the drawing, with date and author.

Work progress reports

Reports for the general contractor and investor in minutes.

Handovers and checklists

Tests, internal handovers and handovers with the investor, based on templates.

Warranty service

Warranty requests that close the project cycle.

Book a meeting

Test Hustro on your project

Our consultants will help you plan the rollout and train your team. We will show you how MEP and engineering companies work with Hustro.

Free demo and consultation
We will show examples from installation companies
14-day free trial
With your documentation uploaded
Dedicated consultant
Full rollout support, no IT involvement needed
Flexible terms
An app tailored to your company’s processes

Book a demo

Our team will contact you within 24 h

Tomasz Jones

Tomasz Jones

Digitization Specialist

Form - Book Demo

FAQ

Frequently asked questions

Didn’t find an answer? Book a short demo – we’ll show Hustro using your own site as an example.

How do I document concealed installations in Hustro?

Before close-up, the crew photographs the installation with a phone and pins the photos to the spot on the drawing. Each photo has a date, author and location, so years later you know what is behind the wall or above the ceiling.

Do subcontractors have to install the app?

No. The subcontractor gets a task notification and can reply about issues without installing the app. If they want, they can also use the app under your license.

How do I prepare a work progress report for the general contractor?

Site data – tasks, statuses and photos – is already in the system. You select the systems and scope, the PDF report is generated in minutes, and you can send it directly from the app.

How does the crew know which drawing version is current?

A new revision syncs automatically across all devices, and previous versions move to the history. The current drawing is always visible on site – offline too.

Does Hustro work offline on site?

Yes. The mobile app works fully offline. Photos, tasks and drawing markups are saved locally and sync automatically when the connection is restored – even in basements and shafts.

How long does Hustro implementation take?

Management training takes 60–90 minutes. Foremen usually learn the app within one shift. Consultants support the rollout from day one, including data migration from your previous system.

How does Hustro help with GC settlements?

Every task and photo has a full, dated history, and agreements are recorded in one place. Proof of completed work is available in seconds.

Can checklists be customized?

Yes. You create your own checklists for tests and handovers of electrical, ventilation or plumbing installations, save them as templates and use them on every site.

Can I manage several sites at once?

Yes. Each site has a separate workspace with its own documentation and team, and you see work progress across all projects from one place.

How is site data protected?

Data is encrypted in transit and at rest. Hustro uses two-factor authentication and granular permissions, is GDPR compliant and creates regular backups.

Hustro