CDE platform · ISO 19650
Construction documentation where you always know which version is current
A document register with ISO 19650 status codes, side-by-side revision comparison and multi-step approval – in the browser, on the phone and in your inbox. Designer, contractor, inspector and investor work on one approved version.
ISO 19650 compliance Revision comparison Sequential and parallel approvals
✓Reported
2Approval
3Resolved
Sequential approval1 / 4
Key information
Request to approve a substitute for the window joinery specified in the detailed design.
Created by: Budrysk A.Trusted by construction industry leaders in 8 countries – from general contractors to property developers and H&S teams













































Problems
What does working from an outdated drawing cost?
Documentation scattered across emails and drives is not just admin clutter – it means rework, downtime and disputes at handover.
Decision paralysis
“Document review takes weeks while the site waits”
A material submittal goes back and forth by email between the site manager, designer, inspector and investor. Nobody knows who holds the decision, and every day of delay means downtime and cost.
Version chaos
“Which drawing version is current? Nobody knows for sure”
Files named “_final_v3_corrected.pdf” in emails, on drives and in WhatsApp. The crew works from an outdated drawing, and the rework costs more than the entire documentation.
No access on site
“The drawing is in the office, but the decision is made at the wall”
Different systems, missing permissions and no signal mean key information does not reach where it is needed – the construction site.
Construction workers spend an average of 5.5 hours a week just looking for project information, and 48% of rework stems from bad data and poor communication (FMI and Autodesk, “Construction Disconnected”, 2018).
of storage per project, with whole-folder upload
independent data centers in Europe
is all it can take to start – full implementation within 2 weeks
for subcontractor access – included in the main license
CDE platform
Register, comparison, approval – and the site
Four things that decide whether a CDE really works or is merely implemented.
Register and versioning
One document register with full revision history
Every drawing, specification and material submittal has a code, revision and ISO 19650 status. A new version automatically supersedes the previous one, which goes to the history – no one will print an outdated drawing.
- Containers by discipline and stage
- Revisions P01 → C01 with full history
- Search by code and title
- Whole-folder upload
Containers
Osiedle Parkowe
01 Architecture214
02 Structure96
03 Plumbing131
04 Electrical88
05 Materials57
ISO 19650 state
S0 WIP
S2 Shared
A1 Published
CR Archive
P03For review (S3)Structural Design Office · today 09:12current
P02Shared (S2)Structural Design Office · 17.10
P01WIP (S0)Structural Design Office · 02.10
Version comparison
Side-by-side revision comparison – see the change in a second
Pick two revisions of a drawing and view them side by side. Zoom and pan are synchronized, so you immediately spot a moved wall, a new door or a changed opening. Mark your remark with a comment on the drawing.
- Two revisions side by side
- Synchronized zoom and pan
- Comments and @mentions on the drawing
- An issue straight from a remark
Rev. 01 · 12.09.2026
Rev. 02 · 24.10.2026
Bedroom wall moved by 0.8 m, new bathroom door. @Biuro Projektowe please confirm the impact on MEP services.
Approval process
Step-by-step document approval – no emails or phone calls
The workflow is assigned automatically, and each approver sees when it is their turn. Sequential and parallel paths, multiple people per step, rejection always with a reason. The system will not move forward without the required approvals.
- Sequential and parallel paths
- Rejection with a reason and an @mention
- Step locked without required approvals
- Full decision history
✓Reported
2Approval
3Resolved
Sequential approval1 / 4
Key information
Request to approve a substitute for the window joinery specified in the detailed design.
Created by: Budrysk A.✕22 October 09:40
Rejected at the Approval stepDesignerThe proposed substitute was not approved due to the difference in the Uw value. Please submit a substitute with a declaration or agree it again. @Budrysk A.
Parallel path
On site
The current drawing in your pocket – even without signal
The foreman and inspector always open the current revision on their phone. Drawings work offline, you pin issues to a location on the floor plan, and the IFC model shows an element together with its related documents.
- Offline mode on phone and tablet
- Issues pinned to the floor plan
- IFC model viewer
- New revision notification
24/10/2026 Revision 02 – Wall layout change
IFC classIfcSlab
Related documents3
ISO 19650
Document life cycle compliant with ISO 19650
Container states and suitability codes that every project participant understands – from the design office to the site inspector.
State 1
Work in progress (WIP)
Work in progress within the author’s team. The document is not visible to other project parties.
S0work in progress
State 2
Shared
Document shared with other disciplines for coordination, information, review or authorization.
S1coordinationS2informationS3reviewS4authorization
State 3
Published
Approved and released for construction. Code B means approval with comments to be addressed.
A1for constructionB1with comments
State 4
Archive
As-built documentation and a full, unchangeable revision history – for handover and the warranty period.
CRas-built record
Revision numbering:P01→P02→P03preliminary versions→C01contract version, released for construction
See the document workflow on an example from your site
We will show you the register, revision comparison and material submittal approval from request to investor decision – in 30 minutes.
CDE processes
Ready-made document workflows every site runs
We configure them with you during implementation – with your roles, steps and deadlines.
01
Design change request
A request with justification, cost and schedule impact, linked to specific drawings. Approval follows the agreed workflow.
02
Material submittal approval
A material submittal or substitute goes to approvers in the agreed order. Comments, rejections and decisions stay in the history.
03
RFI handling
Contractor questions and designer answers in one place, always in the context of a specific drawing or model.
04
Handover reports
Technical and quality handovers with photos and remarks pinned to the floor plan. The PDF report is generated automatically.
Comparison
Hustro compared with popular CDE platforms
Comparison, approvals and ISO 19650 are standard today. The difference is whether documentation lives together with the site – in one app, with local support.
| Feature | Hustro CDE | Autodesk Docs | Dalux Box | PlanRadar |
|---|---|---|---|---|
| Drawing revision comparison | Side by side, with synchronized views | Overlay and side-by-side view | PDF; drawings in Dalux Box Pro | Changes next to the previous version |
| Multi-step document approval | Sequential and parallel, multiple people per step | Review and approval workflows | Custom approval workflows | In Pro and Enterprise plans |
| ISO 19650 statuses and codes | Built-in states and suitability codes | Supported | Codes stored in file name fields | –No public statement |
| Issues, inspections, H&S and service in the same app | One app and one license | –Separate product (Autodesk Build) | –Separate product (Dalux Field) | Yes |
Comparison based on publicly available vendor materials as of October 2026. Feature scope may depend on the license plan. Product names are trademarks of their respective owners.
Security and control
Your documentation, your rules
Access control and change history that the investor, auditor and insurer expect.
Data in three data centers in Europe
Files stored in three independent data centers in Europe, with backups.
Folder and location permissions
A subcontractor sees only their own disciplines and locations. The investor sees what has been shared with them.
Full audit trail
Who uploaded, who changed the status, who approved and with what comment – every event recorded in the history.
Change notifications
New revision, approval request, rejection – the right people get notified in the app and by email.
Customer stories
Investors and contractors who organized their documentation
From a five-star hotel to a PLN 278m factory – one version of documents for all project parties.


€180mproperty portfolio
Platan Group: organized documentation from day one
Aries Residence Karpacz: architects, discipline designers and the investor work on the same up-to-date version of documents. Revisions visible instantly, change history easy to follow.
Read the story
PLN 278mproject valueIndustrial construction
PTB Nickel and Josera: investor and contractor on shared data
Construction of the Josera factory – both parties made decisions based on the same up-to-date documents.
7projects at onceGeneral contractor

CREA Budownictwo: 7 projects without chaos
Documentation, defects and handovers in one system – no more documents scattered across projects.
1100+projectsInvestor supervision
Uni-form: digital investor supervision
Hustro as a CDE platform for design documentation and a tool for defects, handovers and PDF reports.

Residential developer
Mesta Development: digital collaboration with contractors
Design documentation, defects and service in one place – Hustro as a complement to the CRM system.
Customer testimonials
One version of documents for the whole project
Organized documentation from day one
“Architects, discipline designers and the investor work on the same up-to-date version of documents. Revisions are visible instantly and the change history is easy to follow. I recommend Hustro.”★★★★★
Decisions based on always up-to-date data
“Speed and the ability to handle large files let us make decisions based on always up-to-date data. Transparent information exchange has brought measurable benefits.”★★★★★
All it takes is the will
“The platform helped us organize the flow of information and eliminate scattered documents, which used to be one of our main challenges when running multiple projects.”
Blog
Guides to CDE platforms
How to choose a CDE, how to define requirements and how to make sure your team actually uses it.

How to write CDE platform requirements that work – not just on paper
Read the article
CDE platform adoption – why teams go back to email despite a rolled-out system
Read the article
A CDE platform for a residential developer – from zoning approval to post-handover defects
Read the articleWhat is a CDE and what is it used for on a construction site?
A CDE (Common Data Environment) is a single shared data environment for the entire construction project. Drawings, technical documents, material submittals, approvals and correspondence are stored in one place with version control. This eliminates work on outdated drawings and information chaos between the general contractor, subcontractors, supervision and the investor.
Is Hustro compliant with ISO 19650?
Yes. The Hustro CDE platform supports information container states (work in progress, shared, published, archived), suitability codes (e.g. S0–S4, A, B, CR), revision numbering and a document workflow compliant with ISO 19650 requirements.
How does document version comparison work?
You pick two revisions of a drawing or document and view them side by side. Zoom and pan are synchronized across both views, so changes – moved walls, new openings, revised notes – are visible immediately. You mark remarks with a comment directly on the drawing and can create an issue from it right away.
What does the document approval process look like?
For each document type, you define a workflow: steps, approvers and order. Hustro supports sequential and parallel paths and multiple people per step. Each approver is notified when it is their turn. A rejection requires a reason, and the system will not move forward without the required approvals. All decisions are kept in the history.
How does Hustro prevent work on outdated drawings?
A new revision automatically becomes the current version on all devices, and the previous one goes to the history, marked as superseded. The team is notified of the change, so the inspector and foreman always work on the approved version of the documentation.
What file types does Hustro support?
You can store any project files in Hustro. The viewer supports PDF documents, IFC models, Office files and images – with preview in the browser and on the phone. Native support for DWG drawings is in development; until then, CAD drawings are published as PDF.
Do subcontractors have access to the documentation?
Yes. Subcontractors get access based on permissions granted by the general contractor or investor and see only the documents and locations they are authorized for. They do not need a separate license – access is included in the main user license.
Is the documentation available offline on site?
Yes. Drawings and documents can be downloaded for offline mode on a phone or tablet. The inspector or foreman has access to current documentation even without signal – in a basement, a hall or a shipyard. Changes sync automatically once the connection is back.
What does implementing the documentation module involve?
Implementation takes from 24 hours to 2 weeks. Our team configures the container structure, permissions and approval workflows, and helps upload existing design documentation. Users can start working on day one – no lengthy IT project.
Test Hustro on your project
Our consultants will help you plan the rollout and train your team. We’ll show you how developers work with Hustro.
Book a demo
Our team will contact you within 24 h
Tomasz Jones
Digitization Specialist
